Deployed 3C Digital Twin across 12 offshore wind farms (3.2 GW total). AI dispatch optimization reduced curtailment from 8.4% to 2.1%. Predictive maintenance extended blade inspection intervals by 40%, reducing O&M costs by €14M annually.
Revenue Increase
+18%
Curtailment Reduction
8.4% → 2.1%
O&M Savings/yr
€14M
ROI on Platform
22x
Challenge
Ørsted's existing SCADA system provided raw telemetry but lacked predictive capability. Unplanned downtime was costing an estimated €2.8M per turbine per year.
Solution
3C Physics Engine modeled wake interactions and turbulence. Fault Predictor identified 23 bearing failures 6 weeks in advance. AI Dispatch reduced grid congestion events by 71%.